Fast-forward to 2014….and it's been sometime since the last bit of work was completed on the driveway. Pete also completed the landscaping along the driveway last year and installed extra drainage for the possible monsoons that QLD experiences from time to time.








Council have also recently approved the PBA submitted for the house and we've done some maintenance on the driveway. So it's onto some more organising for the next steps and maybe even a chance for a visit in the next weeks.









Comments

Popular posts from this blog

Footing steel installed and a much needed arrival

Toe footing steel RW2 section was installed, excess dirt and rocks were taken away and the toilet arrived on site (very good news)

Final Section Concrete Pour

It's been a long time coming, but we finally made it to the last concrete pour of this driveway. The last section took 16 cubic metres of concrete and we proved today that a concrete truck with 5 cubic metres of concrete can reverse up the driveway with no trouble at all. This says a lot about the strength and planning of such a driveway given the slope. It also has greater meaning for the house build - all footings and slabs will have easy access for the trucks in the future! Pete, Will and Clynton were on board today to finish the final section, which looks great - well done guys.

Stage 2 of driveway (top section) started.

We have finally started on the Stage 2 of the driveway - after literally months of rain.  We could not have stopped the last stage at a better time - it was hammering down with rain 3 days after we completed stage 1. Peter is again available so we are going all out to finish Stage 2.  After sorting out where the garage will be placed (thanks Chris) in order for the driveway to meet up correctly from its current position, we are now ready to install the top section.