Tuesday, January 8, 2013
3rd Section of driveway being prepared - day 4
Today was the final prep day for the 3rd section of driveway. Grates had to be installed before the concrete gets poured tomorrow. The first set of pictures below show the top part of the driveway which will be done at a later time.