Today was the final prep day for the 3rd section of driveway. Grates had to be installed before the concrete gets poured tomorrow. The first set of pictures below show the top part of the driveway which will be done at a later time.
Today was a big success, the rest of the wall was cut by allcoast saw cutting and the drainage behind the wall was installed. This consists of an aggy pipe with aggregate stones on top and finally soil as the final layer. Peter was able to use the stockpile of soil on site and ordered exactly the right amount of drainage gravel (10 meters) for the job. Well done Pete!