Skip to main content

4th Section of driveway being prepared

Today was the kerb section of the driveway that was prepared, including the industrial-grade galvanized pipes connecting the storm-water pit/chamber to the kerb guttering. Our hydraulic engineer specified these based on the brief to him that we will have heavy vehicles going up and down that driveway during the house build. Normally there would be PVC storm-water piping installed.
We've also been lucky with the weather, the driest spell they have had for a supposedly wet season.


















Comments

Popular posts from this blog

Where it all started...

We saw this add in front of a realestate agent and decided to make an offer.  After some negotiation, we finally secured the property for AUD$182K.

Wall cutting done, aggy pipe and behind-wall fill installed

Today was a big success, the rest of the wall was cut by allcoast saw cutting and the drainage behind the wall was installed. This consists of an aggy pipe with aggregate stones on top and finally soil as the final layer. Peter was able to use the stockpile of soil on site and ordered exactly the right amount of drainage gravel (10 meters) for the job. Well done Pete!

Top section poured today

What an improvement, just seeing this top section poured really shows how the whole driveway is coming together and also how much load it can handle. Having both a loaded concrete truck and pump truck being able to get up the driveway and be both on it at the same time, tells us that the driveway is doing what it's promised - it's able to handle very heavy vehicles and look ascetically pleasing as well as providing drainage and retaining functions for that part of the slope. Peter, Will and Clynton were all on deck today, pushing out the slab which looks fantastic. Job well done guys.