1st Section of driveway poured

Today was D-day, the start of the finale for this project - the 1st section of driveway was poured in spectacular style. All hands were on deck and even some some extra help from ex-clams drummer - John Shortland was brought in to tackle this beast of a concrete slab.


































Comments

Popular posts from this blog

Top section poured today

What an improvement, just seeing this top section poured really shows how the whole driveway is coming together and also how much load it can handle. Having both a loaded concrete truck and pump truck being able to get up the driveway and be both on it at the same time, tells us that the driveway is doing what it's promised - it's able to handle very heavy vehicles and look ascetically pleasing as well as providing drainage and retaining functions for that part of the slope. Peter, Will and Clynton were all on deck today, pushing out the slab which looks fantastic. Job well done guys.

Then we had the heaviest rains in about 30 years...

Pete helped us out to move forward with sorting out the drainage and erosion issues, before we could continue