3rd Section of driveway being prepared - day 1

Today was all about removing the formwork from the previous section poured on wednesday and forming up the last section of driveway to be done early in January.
Pete's tried to use as much space as possible in the very narrow section we have there near the kerb.












Comments

Popular posts from this blog

Top section poured today

What an improvement, just seeing this top section poured really shows how the whole driveway is coming together and also how much load it can handle. Having both a loaded concrete truck and pump truck being able to get up the driveway and be both on it at the same time, tells us that the driveway is doing what it's promised - it's able to handle very heavy vehicles and look ascetically pleasing as well as providing drainage and retaining functions for that part of the slope. Peter, Will and Clynton were all on deck today, pushing out the slab which looks fantastic. Job well done guys.

Then we had the heaviest rains in about 30 years...

Pete helped us out to move forward with sorting out the drainage and erosion issues, before we could continue