Walls core filled with concrete Today

Today the boys filled the core of the retaining wall with concrete, inserted reo bars into the wall and poured the wing walls which are needed behind the wall to prevent soil and rocks washing into the catchment basin. It's a solid looking wall which will be going nowhere anytime soon. 