The last couple of days has been focused on installing stormwater pipes and sewer connection. There was quite some digging going on even with the rain that was on site. Council came in and did an inspection as well.
Today was a big success, the rest of the wall was cut by allcoast saw cutting and the drainage behind the wall was installed. This consists of an aggy pipe with aggregate stones on top and finally soil as the final layer. Peter was able to use the stockpile of soil on site and ordered exactly the right amount of drainage gravel (10 meters) for the job. Well done Pete!