Ford Blocklaying aren't mucking around, they are almost done with the wall and the curves that have been created are looking spectacular. Pete also ordered a chilli bin as we need to cart the debris left over from the wall construction this coming week. There's quite a bit to do once the wall has been built, installing the aggy pipe behind the wall and waterproofing it for starters. Let's hope the weather holds up.
What an improvement, just seeing this top section poured really shows how the whole driveway is coming together and also how much load it can handle. Having both a loaded concrete truck and pump truck being able to get up the driveway and be both on it at the same time, tells us that the driveway is doing what it's promised - it's able to handle very heavy vehicles and look ascetically pleasing as well as providing drainage and retaining functions for that part of the slope. Peter, Will and Clynton were all on deck today, pushing out the slab which looks fantastic. Job well done guys.