Saw cut of wall, road base install

Today we had the top of the retaining wall cut to give it an even edge. This will of course need to be rendered to provide a very smooth looking finish, however this is the required first step to give the top of the wall its intended form. Also delivered today was the road base for prep of the driveway concrete pour next week.  Aggy pipes and geo textile fabric were delivered as well, ready for install tomorrow. Things are going like clockwork on this project!




















Comments

Popular posts from this blog

Top section poured today

What an improvement, just seeing this top section poured really shows how the whole driveway is coming together and also how much load it can handle. Having both a loaded concrete truck and pump truck being able to get up the driveway and be both on it at the same time, tells us that the driveway is doing what it's promised - it's able to handle very heavy vehicles and look ascetically pleasing as well as providing drainage and retaining functions for that part of the slope. Peter, Will and Clynton were all on deck today, pushing out the slab which looks fantastic. Job well done guys.

Then we had the heaviest rains in about 30 years...

Pete helped us out to move forward with sorting out the drainage and erosion issues, before we could continue