Today the guys were continuing preping the wall for the pour (which will happen on wed morning now, not tuesday as was planned) and forming up both area around the catchment basin as well as the driveway. Once the wall is core filled, the aggy pipe can be laid behind the wall with aggregate installed ontop and finally some top soil. Once that's done, we'll be ready for the top of the wall to be saw cut and the driveway concreting can start. Things are really moving.
Today was a big success, the rest of the wall was cut by allcoast saw cutting and the drainage behind the wall was installed. This consists of an aggy pipe with aggregate stones on top and finally soil as the final layer. Peter was able to use the stockpile of soil on site and ordered exactly the right amount of drainage gravel (10 meters) for the job. Well done Pete!